Good projects start with good engineering and end with good project management.

  • SOLAR ENERGY POWER PLANTS

4,8MW Karakeçeli SPP – Kırıkkale
7 MW Rose Enerji SPP – Isparta
8 MW Simav&Kestel SPP – Kütahya
9,6MW Göğem SPP – Usak
10,3MW Kıravdan SPP – Eskişehir
5 MW Jitomir SPP – Ukrayna
1.365 MW BIM Çatı SPP – Istanbul
1.379 MW Güçbir Jeneratör Çatı SPP – Zonguldak
Erpiliç – 24 Adet Çatı SPP – Invitation Letter Application Process

  • HYBRID POWER PLANTS

Bioden Biogas + Solar Hybrid Power Plant Application Process

  • WIND POWER PLANTS

100 MW Ardıçlı WPP (e-BoP) & 154kV SS & ETL
100 MW Bağlar WPP (e-BoP) & 154kV SS & ETL
60 MW Biga WPP (e-BoP) & 154kV SS
52,5 MW YAHYALI WPP (e-BoP) & 154kV SS & ETL
30 MW Edincik WPP (e-BoP) & 154kV SS & ETL
12 MW Geriş WPP (e-BoP) & 34,5kV SS & ETL
154kV AKSU WPP SS & ETL
154kV KAYADÜZÜ WPP SS
154kV KİLLİK WPP SS
154kV METRİSTEPE WPP 154kV SS

  • NATURAL GAS CYCLE POWER PLANTS

1200 MW Hamitabat CCPP – 380kV SS & ETL
1000 MW Erbil Gas Power Station 132kV SS (extension) / IRAK
1000 MW Sulaymaniah Gas Power Station 132kV SS (extension) / IRAK
900MW ANTALYA CCPP 380kV SS (extension)
890MW SAMSUN CCPP 380kV SS
816MW AMBARLI CCPP 380kV SS
775MW DENİZLİ CCPP 380kV SS
350 MW Port Sudan CCPP (e-BoP) – 220kV SS / SUDAN
525 MW Garri-3 CCPP (e-BoP) – 220kV SS / SUDAN
150MW Baadri-Diyar Polteks PP – 132kV SS / IRAK
143MW BİLECİK CCPP 154kV SS
143MW ÇAY CCPP 154kV SS

  • HYDROELECTRIC POWER PLANTS

154kV KOZBÜKÜ HEPP SS
154kV ÇAYKARA HEPP SS
154kV Daran I-II HEPP SS & ETL

  • SUBSTATIONS

ITM130 – 154kV Sivas SS
ITM139 – 380kV ADAPAZARI SS
ITM173 – 154Kv Gaziantep-6 SS
ITM184 – 154kV Bursa GIS SS
ITM196 – 154kV Selimiye GIS SS (extension)
ITM206 – 154kV Güzyurdu SS
154kV RB Karesi SS
154kV Limak Cement Polatlı SS & ETL
154kV Ordu SS (extension)
132kV Pordel&Super Steel SS Sulaymaniah/IRAK
132kV Bazian SS Sulaymaniah/IRAK
33/11 kV Krman Steel SS

  • ENERGY TRANSMISSION LINES

6.8km 2x(3×477)MCM ETL and 3.5km 2x[3x(1×400/35mm²)] Al XLPE Underground Cable Project – Rose Enerji SPP – Isparta
3.8km 3×1/0 ETL – Karakeçeli SPP – Kırıkkale
3km 3×3/0 ETL – Kıravdan SPP – Eskişehir
2.5km 3×3/0 ETL – Göğem SPP – Usak
0.7km 3×3/0 ETL – Simav&Kestel SPP – Kütahya

  • UNDERGROUND CABLE LINES

Torunlar – Alibeyköy – 45km 154kV Underground Cable Project
TKABY.31 – Hilal GIS SS – Alsancak GIS SS – 154 kV Underground Cable Project
TKABY.41 Bursa San. SS – Beşevler SS – 154kV 1600mm2 Underground Cable Project

* Our project references have been created in line with the experiences of our employees.

“Our aim; To create superior, qualified and sustainable value in energy production, transmission, distribution services and planning for our customers, employees and our country.”

EXPERT IN THE SECTOR

“We are trying to maximize customer satisfaction by using all the facilities we have.

With the quality services we provide, we aim to transform our business relationships into permanent solution partnerships.”

FOR NEEDS AND DEMANDS